Reports until 21:42, Thursday 17 December 2015
LHO General
corey.gray@LIGO.ORG - posted 21:42, Thursday 17 December 2015 (24292)
Mid Shift Summary

H1 has been locked for 5.5+ hrs with a range between 70-80Mpc (only one ETMy saturation).

All running well here.  I was not able to log into the ops workstation (operator0) at the beginning of the shift, but Jim B was able to remedy that.

Snowed earlier in the shift, and we have about 0.75" of snow on the ground currently.  Winds are at about 6mph & useism is at 0.4um/s