Displaying report 1-1 of 1.
Reports until 00:14, Wednesday 23 December 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:14, Wednesday 23 December 2015 (24403)
Ops Owl Shift Transition
Title:  12/23/2015, Owl Shift 08:00 – 16:00 (00:00 – 08:00) All times in UTC (PT)
	
State of H1: 08:00 (00:00), The IFO is in Observing mode for the past 2.5 hours. Power and range are at normal levels. Wind is currently a gentle breeze (8-12mph) and building. Seismic and microseism are both rising as well. Monitoring CP-3 N2 levels.     

Outgoing Operator: TJ
Displaying report 1-1 of 1.