Ops Day Shift: 16:00-23:59UTC, 08:00-16:00PT
State of H1: locked in Observe for 33 hours, range is 81.5Mpc
On Site: Darkhan and DickG
Commissioning Meeting at 8:30:
-
MikeL called in
-
MikeL expressed a preference to run through Maintenance tomorrow
-
only known commissioning/calibratoin activity for tomorrow is EX Pcal - Darkhan said it is ok to delay until next week
Shift Details as of 17:20UTC
-
four ETMY saturations, at 16:46:03, 16:48:46, 17:10:19, and 17:18:11UTC
-
range dropped to approx. 5Mpc for the saturations at 16:48 and 17:10UTC
-
no wind - 0mph across the site
-
useism at the Corner Station in Z direction is at 0.5um/s and is increasing
-
useism at EY and EX, at Y direction and X direction respectively, is between 0.2 and 0.3um/s, and looks pretty flat for the past 8 hours
ISI Blend Filters - snapshot of current configuration attached