What happened:
An accidental button push took H1 out of Observe at 19:03:46UTC, and H1 was returned to Observe at 19:25:31UTC after the PSL diode chiller was filled.
Timeline Details:
Given these activites, after ETMY L2L filter back was restored and resulting glitch in DARM passed, the IFO was not disturbed again until I filled the chiller between 19:19:00UTC and 19:24:00UTC.
Timeline Summary:
IFO Guardian Log Details:
2015-12-27T08:01:00.52831 IFO [ALL_NODES_OK.enter]
2015-12-28T19:03:46.23209 IFO [ALL_NODES_OK.run] USERMSG: node NOTIFICATION: DIAG_SDF
2015-12-28T19:03:46.35568 IFO state returned jump target: DROP_OK
2015-12-28T19:03:46.35588 IFO [ALL_NODES_OK.exit]
2015-12-28T19:03:46.41705 IFO JUMP: ALL_NODES_OK->DROP_OK
2015-12-28T19:03:46.41724 IFO calculating path: DROP_OK->ALL_NODES_OK
2015-12-28T19:03:46.41748 IFO new target: WAITING_FOR_NODES_OK
2015-12-28T19:03:46.41790 IFO executing state: DROP_OK (5)
2015-12-28T19:03:46.41802 IFO [DROP_OK.enter]
2015-12-28T19:03:46.60496 IFO EDGE: DROP_OK->WAITING_FOR_NODES_OK
2015-12-28T19:03:46.60534 IFO calculating path: WAITING_FOR_NODES_OK->ALL_NODES_OK
2015-12-28T19:03:46.60572 IFO new target: ALL_NODES_OK
2015-12-28T19:03:46.60645 IFO executing state: WAITING_FOR_NODES_OK (20)
2015-12-28T19:03:46.60664 IFO [WAITING_FOR_NODES_OK.enter]
2015-12-28T19:03:47.92328 IFO EDGE: WAITING_FOR_NODES_OK->ALL_NODES_OK
2015-12-28T19:03:47.92369 IFO calculating path: ALL_NODES_OK->ALL_NODES_OK
2015-12-28T19:03:47.92443 IFO executing state: ALL_NODES_OK (100)
2015-12-28T19:03:47.92461 IFO [ALL_NODES_OK.enter]
Plots attached:
Water level checking and filling the Diode chiller is a known "issue". There are plans to make it easier for the operators to keep track of the Diode chiller water levels after O1.