TITLE: 12/29 DAY Shift: 16:00-00:00UTC (08:00-04:00PDT), all times posted in UTC
STATE of H1: NLN for 3+hrs at 80Mpc
Incoming Operator: Jeff B.
Support: Kissel on-site fellow, Sheila (Locking Commissioner)
Quick Summary:
Fairly light Maintenance Day (which occurred only because H1 dropped out of lock). Current lock looks noticeably less ratty (why??).
Shift Activities:
-
ETMy Saturations: 17:13, 22:48
-
MAINTENANCE ITEMS:
-
Per Ops Checksheet Tues Activity: Checked that HEPI WD Counters were all zero (no need to clear)
-
16:35-16:50 Bubba dropping off snow blower (out at woodshop building)
-
17:00 GRB Test acknowledged. This is the only
-
17:47-18:52utc: Kissel performing Charge Measurement (~1hr)
-
17:53-17:57utc: Gray Reset PSL Watchdog at 17:55 (~5min)
-
18:15- ~20:00 LN2 truck on-site (MY CP3)
-
18:35-18:41 VPW Water heater check (Bubba)
-
18:56 US Linen delivery (30-60min)
-
NO LVEA SWEEP was performed since there were no VEA entrances
-
17:45 H1Lockloss!
-
18:53-19:31 Initial Alignment
-
19:57-20:25 Kyle heading to MY (offsite at 20:48)
-
20:49 Undisturbed