LHO VE
kyle.ryan@LIGO.ORG - posted 15:48, Monday 19 March 2012 (2458)
Leak tested triax feedthrough installed on BSC8 on 3/2/2012->No leak detected (1x10-9 torr*L/sec baseline)
Flooded O-ring at leak detector inlet with He after check and observed predictable permeation response