Reports until 16:21, Monday 19 March 2012
LHO General
jonathan.berliner@LIGO.ORG - posted 16:21, Monday 19 March 2012 (2459)
Monday Ops Log
- LVC meeting is underway in Cambridge, MA. Assorted staff is off-site this week.
- Apollo installing cable trays. Work was not as dusty as expected (very brief dust alarm).
- TerryS and crew cleaning around HAM3.
- Kyle leak-checking by BSC8.
- Bob Rhodes on site working on HVAC.
- CDS guests visiting this week to review code changes.
- HEPI pipe welding at EX.
- CDS people rebooting DAQ throughout the day.
- Rear exterior LSB door is out of order (by Dale's office), Rodney is having a locksmith fix it.
- OSB Doors locked at 16:10 PST.