Displaying report 1-1 of 1.
Reports until 12:09, Sunday 03 January 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 12:09, Sunday 03 January 2016 - last comment - 12:25, Sunday 03 January 2016(24658)
Ops Day Mid-Shift Summary
   IFO locked and observing for past 9 hours. Seismic and microseism are flat and mostly within normal range bounds. Microseism is near the top of the range bounds. Winds are up to a light breeze (up to 7mph), outside temps are 18F for all reporting stations. There have been several ETM-Y saturations, however the remains around 80Mpc.      
Comments related to this report
jeffrey.bartlett@LIGO.ORG - 12:25, Sunday 03 January 2016 (24659)
   It is currently snowing at the site, a dry light snow with about .25" accumulation. The roads and parking lot do not appear to be slippery. However visibility is somewhat limited. 
Displaying report 1-1 of 1.