Day Ops Shift Summary
One of the H1OMC Tubes was installed. Looks like they staged the second one for install as well.
HAM3 In-Chamber Cleaning continued
Dave and crew continued SUS/SEI Testing work (including a reboot of the DAQ (David Stone went out to EY to power down Actuators before testing).
During OMC work, noticed fairly high dust counts (Dust Monitor #1's 0.3um counts hovered between 8,000-15,000 counts over a 75min timeframe.
Dale had a school tour in the afternoon.