Displaying report 1-1 of 1.
Reports until 13:18, Monday 11 January 2016
H1 INJ (DetChar, INJ)
christopher.biwer@LIGO.ORG - posted 13:18, Monday 11 January 2016 - last comment - 16:51, Monday 11 January 2016(24867)
hardware injections test at H1 and L1
I will be conducting some hardware injection tests at H1 and L1. This aLog will be updated as hardware injections are scheduled.
Comments related to this report
christopher.biwer@LIGO.ORG - 13:35, Monday 11 January 2016 (24869)
I am adding the following to the schedule file:
1136584223 1 1.0 coherentbbh20_1135136337_
christopher.biwer@LIGO.ORG - 14:01, Monday 11 January 2016 (24871)
We will leave observation mode briefly and Jeff will turn off two PCAL lines that were on from the PCAL tests. Hardware injections will resume afterwards.
christopher.biwer@LIGO.ORG - 14:07, Monday 11 January 2016 (24873)
We are back in observation mode, the PCAL lines are off and I've added the following lines to the schedule:
1136586132 1 1.0 coherentbbh21_1135136336_
1136587232 1 1.0 coherentbbh22_1135136336_
1136588332 1 1.0 coherentbbh23_1135136337_
1136589432 1 1.0 coherentbbh24_1135136337_
1136590532 1 1.0 coherentbbh25_1135136337_
1136591632 1 1.0 coherentbbh26_1135136336_
1136592732 1 1.0 coherentbbh27_1135136336_
1136593832 1 1.0 coherentbbh28_1135136335_
1136594932 1 1.0 coherentbbh29_1135136336_
christopher.biwer@LIGO.ORG - 16:51, Monday 11 January 2016 (24881)
These injections are now complete.
Displaying report 1-1 of 1.