Reports until 14:56, Monday 11 January 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 14:56, Monday 11 January 2016 (24875)
Mid-day Shift Summary

Shift Summary:  Was Observing unitl an earthquake in Philippines knocked us out.

Incoming operator: Ed

Activity log:

17:03 Lockloss due to an earthquake. See alog24858.

17:12 Rick shutdown 5 kHz Pcal line at X-end.

18:59 Bubba going to mid-Y to work on the pipe under the beam tube.

20:00 Hand over the ifo to Ed.

 

Monday Morning Meeting Notes

- Jeff gave update on the calibraiton world (sorry I didn't really catch the content. I heard something about high frequency line and data quality flag). Tomorrow is the end of calibration period.

- PEM injection period after O1 ends.

- After tomorrow -- don't call people at night (except for Mike and Richard).

- IFO should be ready to be handed over to the comissioners by Friday.