TITLE: Jan 11 DAY (half) Shift 20:00-00:00UTC (12:00-16:00 PDT), all times posted in UTC
STATE Of H1: Observing
INCOMING OPERATOR: Jeff B
QUICK SUMMARY:
Ground motion is high but not too high from preventing stable locking
IFO locked in the 78Mpc range for past 3 hrs
Downward trend in recycle power will need to be addressed at the end of calibration testing at LLO
Shipment of Transformers arrived. Truck diverted to LSB where Bubba met for the offload
ACTIVITY LOG:
11:20 IFO re-locked at NLN
11:21 Intent Bit set to Observing
22:02 Truck Loaded with transformers for Bubba
22:03 Intention Bit momentarily toggled for changing of ETMY calibration lines
22:46 Kyle and John out to MY to do daily CP3 overfill
23:21 Watching recycle power decay. LLO is running calibrations. We have ≈1.5 hours until we need to re-align TMS to correct in order to save lock. This is about the same amount of time that Chris Biwer will need to complete his work at LLO