Reports until 16:47, Monday 11 January 2016
LHO VE
kyle.ryan@LIGO.ORG - posted 16:47, Monday 11 January 2016 (24880)
Another attempt to dislodge obstruction in CP3 level sensing tube
Kyle, John 

After first decoupling the 3/8" tubing at the top of the CP3 vacuum vessel, we fed SS wire into the obstructed 1/4" level sensing tube.  We were able to feed enough wire as to think that we were within 1 foot of where the tube connects with the inner LN2 reservoir -> We then remove the wire and coupled the 3/8" line 

For tonight, we are leaving the two sensing lines combined at the 3-valve valve body via opening the valve which normally isolates the two.