Displaying report 1-1 of 1.
Reports until 00:01, Tuesday 12 January 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:01, Tuesday 12 January 2016 (24886)
Ops Evening Shift Summary
Activity Log: All Times in UTC (PT)

00:00 (16:00) Take over from Ed
00:26 (16:26) John – Back from Mid-Y
00:28 (16:28) Bubba – Back from Mid-Y
00:31 (16:31) Kyle – Back from Mid-Y
01:10 (17:10) Set intent bit to Commissioning to dress up recycling power
01:21 (17:21) Completed alignment tweak on TMS-Y and Back into Observing
08:00 (00:00) Turn over to Travis


End of Shift Summary:

Title:  01/11/2015, Evening Shift 00:00 – 08:00 (16:00 – 00:00) All times in UTC (PT)

Support:  Jeff K., Vinny
 
Incoming Operator: Travis

Shift Detail Summary: Took IFO to Commissioning to adjust recycling power. Moved TMS-Y pitch from 138.4 to 136.2 and yaw from 21.4 to 21.3. POP_A_LF_OUT is now between 16160 and 16200 counts. Will monitor for continued drift and adjust as necessary. 
   The IFO has been in Observing mode for the entire Evening shift, (minus the 10 minutes, the IFO was in Commissioning mode noted in previous aLOG). Environmental conditions remain good, with wind holding at a light breeze or less (< 7 mph), seismic flat, and microseism improving to 0.4um/s. Range and power remained constant during the shift. 
   The recycling power continues above 16k counts; it has not declined during the shift. 