jeffrey.bartlett@LIGO.ORG - posted 00:02, Wednesday 13 January 2016 (24916)
Ops Evening Shift Summary
Activity Log: All Times in UTC (PT)

00:00 (16:00) Take over from TJ
00:19 (16:19) Lockloss – Robert doing hardware injections in CS
00:24 (16:24) Gerardo – In LVEA to speak with Robert and look at viewports
0035 (16:35) HFD – On site to check alarm panel at Mid-Y
00:38 (16:38) Gerardo – Out of the LVEA
00:57 (16:57) Reestablish lock at NOMINAL_LOW_NOISE, in commissioning mode.
01:00 (17:00) HFD – Back from Mid-Y – Corrected trouble with alarm panel
01:01 (17:01) Robert – Back into the LVEA for more calibration work
01:48 (17:48) Lockloss – Commissioning work
02:29 (18:29) Relocked at NOMINAL_LOW_NOISE, in commissioning mode  
03:00 (19:00) Robert – Finished in the LVEA. He did a sweep before exiting
03:30 (19:30) Lockloss – Commissioning work
04:00 (20:00) Relocked at NOMINAL_LOW_NOISE, in commissioning mode
04:10 (20:10) Lockloss – Commissioning work
05:20 (21:20) Relocked at NOMINAL_LOW_NOISE, in commissioning mode
07:53 (23:53) Set the intent bit to Observing - Commissioners are finished for the evening
08:00 (00:00) Turn over to Travis 
	 
  
End of Shift Summary:

Title:  01/12/2015, Evening Shift 00:00 – 08:00 (16:00 – 00:00) All times in UTC (PT)

Support:  Jenne, Kiwamu, Jeff K., Evan G 
 
Incoming Operator: Travis

Shift Detail Summary:  Lock was broken several times during the shift, due to commissioning and calibration work. Relocking was not too difficult and did not require an initial alignment. The wind has come up a bit (3 to 10 mph). Seismic was slightly rang up due to a mild EQ; but has since recovered. Microseism is elevated but within bounds. 
   Commissioning work has finished for the evening and the IFO is back into Observing mode.  
     