Activity Log: All Times in UTC (PT) 00:00 (16:00) Take over from TJ 00:19 (16:19) Lockloss – Robert doing hardware injections in CS 00:24 (16:24) Gerardo – In LVEA to speak with Robert and look at viewports 0035 (16:35) HFD – On site to check alarm panel at Mid-Y 00:38 (16:38) Gerardo – Out of the LVEA 00:57 (16:57) Reestablish lock at NOMINAL_LOW_NOISE, in commissioning mode. 01:00 (17:00) HFD – Back from Mid-Y – Corrected trouble with alarm panel 01:01 (17:01) Robert – Back into the LVEA for more calibration work 01:48 (17:48) Lockloss – Commissioning work 02:29 (18:29) Relocked at NOMINAL_LOW_NOISE, in commissioning mode 03:00 (19:00) Robert – Finished in the LVEA. He did a sweep before exiting 03:30 (19:30) Lockloss – Commissioning work 04:00 (20:00) Relocked at NOMINAL_LOW_NOISE, in commissioning mode 04:10 (20:10) Lockloss – Commissioning work 05:20 (21:20) Relocked at NOMINAL_LOW_NOISE, in commissioning mode 07:53 (23:53) Set the intent bit to Observing - Commissioners are finished for the evening 08:00 (00:00) Turn over to Travis End of Shift Summary: Title: 01/12/2015, Evening Shift 00:00 – 08:00 (16:00 – 00:00) All times in UTC (PT) Support: Jenne, Kiwamu, Jeff K., Evan G Incoming Operator: Travis Shift Detail Summary: Lock was broken several times during the shift, due to commissioning and calibration work. Relocking was not too difficult and did not require an initial alignment. The wind has come up a bit (3 to 10 mph). Seismic was slightly rang up due to a mild EQ; but has since recovered. Microseism is elevated but within bounds. Commissioning work has finished for the evening and the IFO is back into Observing mode.