Activity Log: All Times in UTC (PT) 00:00 (16:00) Take over from TJ 00:19 (16:19) Kyle – Going to Mid-Y to overfill CP3 00:22 (16:22) Robert & Vinny – Going to End-X 00:54 (16:54) Kyle – Back from Mid-Y 01:50 (17:50) Robert & Vinny – Back from End-X 02:39 (18:39) Robert – Swept LVEA 03:11 (19:11) Lockloss – Commissioning activities 03:25 (19:25) Mag 6.7 EQ near Japan – R-Wave 12.9um/s estimated arrival at 04:00 (20:00) 03:25 (19:25) Mag 6.0 EQ near Bolivia 03:57 (19:57) Reset WD trips on BS ST1, ST2, and SUS 04:00 (20:00) Put IFO into DOWN until the ground settles down 08:00 (00:00) Turn over to Travis End of Shift Summary: Title: 01/13/2015, Evening Shift 00:00 – 08:00 (16:00 – 00:00) All times in UTC (PT) Support: Jenne, Evan H., Incoming Operator: Travis Shift Detail Summary: Hardware injections scheduled to start at 08:10 (00:10). While doing an initial alignment after a commissioning lock, were hit with two earthquakes at same time (6.7 near Japan, 6.0 near Bolivia). Seismic has rung up to 5um/s. Reset WD trips on BS. Put the IFO in DOWN until the earth calms a bit. Seismic calmed down enough to try initial alignment and locking. The initial alignment took longer than normal, but was mostly OK. Tried a couple of times but could not get PRM_ALIGN to move past REFL_WFS_CENTERING_PRX. I skipped this step. Trying to relock.