TITLE: 1/15 DAY Shift: 16:00-00:00UTC (08:00-04:00PDT), all times posted in UTC
STATE of H1: Getting back to NLN for Robert
Incoming Operator: TJ
Support: Jenne (help with locking)
Quick Summary:
Robert had H1 for a good chunk of the day.
Shift Activities:
-
17:18 Chris heading down Xarm to check on Enclosure sealing equipment
-
17:28-18:28 Betsy heading over to C&B warehouse for ~1hr
-
17:49 Switched to COMMISSIONING for Robert's PEM injection work.
-
17:51-19:50 Bubba heading to MY for Piping work
-
20:01 Back to OBSERVING
-
21:05 COMMISSIONING for Adam's Detchar injection which he ran remotely and with me on the phone with him.
-
20:09 Back to OBSERVING
-
22:17 Lockloss due to PEM Injection work (BS ISI tripped). Tried locking, but the DRMI (& also PRMI looked pretty bad)
-
22:52-23:25 - Initial Alignment
-
Gerardo made a trip out to MY's CP3 in the afternoon
-
Handing over to Robert & TJ for the night