Reports until 08:27, Friday 15 January 2016
LHO General
corey.gray@LIGO.ORG - posted 08:27, Friday 15 January 2016 (24966)
Transition to DAY Shift Update

TITLE:  1/15 DAY Shift:  16:00-00:00UTC (08:00-04:00PDT), all times posted in UTC     

STATE of H1:   Observing at 76Mpc (locked for almost 14hrs).

Outgoing Operator:  Nutsinee

Quick Summary:

Nutsineee had a quiet shift with H1 in Observing since Jeff's shift.  LVEA useism is below the 90 percentile at 0.4um/s & winds are under 10mph.

Robert is staging to get ready for PEM injection work soon.  Chris Soike inquired about heading down the Xarm to check his set-up/equipment for Enclosure sealing which is slated to start on Tues (he'll probably head down after Robert gets started).