TITLE: 1/15 DAY Shift: 16:00-00:00UTC (08:00-04:00PDT), all times posted in UTC
STATE of H1: Observing at 76Mpc (locked for almost 14hrs).
Outgoing Operator: Nutsinee
Quick Summary:
Nutsineee had a quiet shift with H1 in Observing since Jeff's shift. LVEA useism is below the 90 percentile at 0.4um/s & winds are under 10mph.
Robert is staging to get ready for PEM injection work soon. Chris Soike inquired about heading down the Xarm to check his set-up/equipment for Enclosure sealing which is slated to start on Tues (he'll probably head down after Robert gets started).