TITLE: Jan 19 EVE Shift 20:00-04:00UTC (12:00-20:00 PDT), all times posted in UTC
STATE Of H1: Commissioning
DAY OPERATOR: Patrick
QUICK SUMMARY:
Arrived in time for Journal Club Exodus from the control room but managed to get some preliminary commissioning plans from a few folks.
JEFF K: Reports that he has nothing planned for himself for this evening
JENNE: To take measurements at 2. 10 and 20 W LASER power.; Also, sensing matrix measurement(s)
EVAN:
SHEILA: Darm/actuator/sensor Upconversion studies
ROBERT SCHOFIELD: Reports that he has nothing further to do. PEM injections/measurements are done and he will be going over his data. Any trouble that he would find with his measurements would be the only cause for a re-do.
IFO unlocked for ≈2 hrs prior to my arrival