Displaying report 1-1 of 1.
Reports until 16:31, Tuesday 19 January 2016
LHO General
patrick.thomas@LIGO.ORG - posted 16:31, Tuesday 19 January 2016 (25026)
Ops Day End Shift Summary
TITLE: 01/19 [DAY Shift]: 16:00-00:00 UTC (08:00-16:00 PDT), all times posted in UTC

STATE OF H1: Left IFO at DC readout for Jenne to run tests. Jim's ISI blend filter changes are on all of the BSC chambers.
SHIFT SUMMARY: Received SNEWS test alert at ~ 09:00 AM PDT (see attached). The verbal alarms script reported it as a GRB.
SUPPORT: Jim W., Jenne, Sheila
INCOMING OPERATOR: Ed

ACTIVITY LOG:

15:45 UTC Richard set observing bit to commissioning
15:45 UTC Ken to end X air handler room to look at heater wiring
15:50 UTC Chris to X2 for beam tube sealing
16:11 UTC Chistina and Karen to end stations for cleaning
16:28 UTC Joe D. to LVEA to charge forklift batteries
16:30 UTC Ryan B. patching alog
16:47 UTC Filiberto pulling cables in LVEA (WP 5681)
16:56 UTC Kyle to mid Y (alog 25024)
17:05 UTC Karen and Christina from end Y to end X
17:12 UTC LN2 delivery
17:20 UTC Hugh checking HEPI fluid pump levels at end stations
17:26 UTC Joe D. done
17:42 UTC Karen and Christina done
17:45 UTC Jim W. loaded filter for ETMY ISI, filter not on
17:52 UTC Paradise water delivery
17:59 UTC Hugh done at end stations, going to mechanical room
18:04 UTC Ryan B. patching alog, bugzilla, svn
18:08 UTC Hugh done in mechanical room
18:11 UTC US Linen on site
18:14 UTC Ryan B. done
18:14 UTC Jeff B. to end X, end Y and mechanical room to attach fittings to dust monitor vacuum pumps
18:14 UTC Jason resetting PSL WD (alog 25021)
18:19 UTC Lock loss (reason unknown)
18:23 UTC Jason done, going to LVEA to retrieve equipment
18:26 UTC Jeff K. starting charge measurements on ETMX and ETMY
18:29 UTC Jason back from LVEA
18:41 UTC Kyle back from mid Y
18:41 UTC Karen to LVEA to clean
18:54 UTC LN2 truck leaving
18:56 UTC Joe D. to LVEA to unplug forklift batteries
19:08 UTC Jeff B. done
19:08 UTC US Linen leaving site
19:16 UTC Joe D. done
19:25 UTC Coca Cola truck on site
19:26 UTC Dan M. replacing faulty controller on gds-h1 in MSR (WP 5682)
19:42 UTC Jason to LVEA west bay to retrieve part
19:42 UTC Jim W. setting new filters on all BSCs
19:55 UTC Filiberto done for lunch
19:55 UTC Jim W. setting ETMX ISI to damped
19:57 UTC Dan M. done
19:57 UTC Jason done
20:29 UTC Starting lock acquisition to check Jim W.'s change to blend filters
Lock loss on engaging BS ISI stage 2
21:13 UTC Locked at DC readout with Jim W.'s filter change. Jenne starting tests.
22:04 UTC Kyle to mid Y
22:07 UTC Filiberto and Ed to LVEA to pull cables
Lock loss
22:33 UTC Kyle back
23:09 UTC Filiberto done
23:11 UTC Ken to midY to check grounding
23:33 UTC Ken done
Images attached to this report
Displaying report 1-1 of 1.