TITLE: 01/19 [DAY Shift]: 16:00-00:00 UTC (08:00-16:00 PDT), all times posted in UTC STATE OF H1: Left IFO at DC readout for Jenne to run tests. Jim's ISI blend filter changes are on all of the BSC chambers. SHIFT SUMMARY: Received SNEWS test alert at ~ 09:00 AM PDT (see attached). The verbal alarms script reported it as a GRB. SUPPORT: Jim W., Jenne, Sheila INCOMING OPERATOR: Ed ACTIVITY LOG: 15:45 UTC Richard set observing bit to commissioning 15:45 UTC Ken to end X air handler room to look at heater wiring 15:50 UTC Chris to X2 for beam tube sealing 16:11 UTC Chistina and Karen to end stations for cleaning 16:28 UTC Joe D. to LVEA to charge forklift batteries 16:30 UTC Ryan B. patching alog 16:47 UTC Filiberto pulling cables in LVEA (WP 5681) 16:56 UTC Kyle to mid Y (alog 25024) 17:05 UTC Karen and Christina from end Y to end X 17:12 UTC LN2 delivery 17:20 UTC Hugh checking HEPI fluid pump levels at end stations 17:26 UTC Joe D. done 17:42 UTC Karen and Christina done 17:45 UTC Jim W. loaded filter for ETMY ISI, filter not on 17:52 UTC Paradise water delivery 17:59 UTC Hugh done at end stations, going to mechanical room 18:04 UTC Ryan B. patching alog, bugzilla, svn 18:08 UTC Hugh done in mechanical room 18:11 UTC US Linen on site 18:14 UTC Ryan B. done 18:14 UTC Jeff B. to end X, end Y and mechanical room to attach fittings to dust monitor vacuum pumps 18:14 UTC Jason resetting PSL WD (alog 25021) 18:19 UTC Lock loss (reason unknown) 18:23 UTC Jason done, going to LVEA to retrieve equipment 18:26 UTC Jeff K. starting charge measurements on ETMX and ETMY 18:29 UTC Jason back from LVEA 18:41 UTC Kyle back from mid Y 18:41 UTC Karen to LVEA to clean 18:54 UTC LN2 truck leaving 18:56 UTC Joe D. to LVEA to unplug forklift batteries 19:08 UTC Jeff B. done 19:08 UTC US Linen leaving site 19:16 UTC Joe D. done 19:25 UTC Coca Cola truck on site 19:26 UTC Dan M. replacing faulty controller on gds-h1 in MSR (WP 5682) 19:42 UTC Jason to LVEA west bay to retrieve part 19:42 UTC Jim W. setting new filters on all BSCs 19:55 UTC Filiberto done for lunch 19:55 UTC Jim W. setting ETMX ISI to damped 19:57 UTC Dan M. done 19:57 UTC Jason done 20:29 UTC Starting lock acquisition to check Jim W.'s change to blend filters Lock loss on engaging BS ISI stage 2 21:13 UTC Locked at DC readout with Jim W.'s filter change. Jenne starting tests. 22:04 UTC Kyle to mid Y 22:07 UTC Filiberto and Ed to LVEA to pull cables Lock loss 22:33 UTC Kyle back 23:09 UTC Filiberto done 23:11 UTC Ken to midY to check grounding 23:33 UTC Ken done