STATE OF H1: Still recovering from power outage. ACTIVITY LOG (some missing): 15:44 UTC Unexpected power outage 16:38 UTC Fire department through gate to check on RFAR boxes 16:56 UTC Richard, Jeff B. and Jim W. to end stations to turn on high voltage and HEPI pumps 17:14 UTC Richard turning on h1ecaty1 17:14 UTC Jason and Peter to LVEA to look for an optic 17:39 UTC Richard and company done at end X and going to corner station to turn on TCS chillers and HEPI pumps 17:49 UTC Filiberto to end X to reset fire panel 17:56 UTC Vacuum group touring LVEA (6 or 7 people) 17:57 UTC HEPI pump stations and TCS chillers started in corner station 18:18 UTC Filiberto back from end X 18:24 UTC Jeff B. and Jason to LVEA to start TCS X laser 18:49 UTC Hugh bringing up and isolating HAM ISIs 19:16 UTC Richard and Jim W. to end stations to turn on ALS lasers 19:30 UTC Sheila to CER to power cycle all of the Beckhoff chassis 22:55 UTC Jason to LVEA to look at optical levers 23:02 UTC Jason back 23:34 UTC Dave restarting the EPICS gateway between the slow controls network and the frontend network in an attempt to fix an issue with the Beckhoff SDF 23:47 UTC Dave restarting the Beckhoff SDF code Other notes: End stations: end Y IRIG B chassis power cycled; end X, end Y high voltage turned on; end X, end Y HEPI pump station computers started; end X, end Y ISI coil drivers chassis reset; end Y Beckhoff computer turned on Corner station: TCS chillers turned on; HEPI pump controllers turned on (Jeff B. had to push power button on distribution box); Sheila power cycled all Beckhoff chassis in CER; Sheila turned on the AOS baffle PD chassis in LVEA I started the h0video IOC on h0epics2. Conlog was running upon arrival. However it crashed during the recovery. It still needs to be brought back. Joe D. and Chris worked on beam tube enclosure sealing. There was some trouble starting the corner station HEPI pump controller computer. There was some trouble finding the strip tool template for the wind speeds. I'm not sure if it was found or if TJ created a new one. Things to add to the 'short power outage recovery' document: - Turn on high voltage supplies - Push reset on ISI coil drivers - HEPI pump controller and pumps - TCS chillers - TCS lasers - ALS lasers - Turn on video server