Reports until 16:00, Monday 25 January 2016
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Monday 25 January 2016 (25147)
OPS Day Shift Summary

Title: 1/25 Shift 16:00-24:00 UTC (8:00-16:00 PST).  All times in UTC.

State of H1: Locked at DC Readout for Commissioning measurements

Shift Summary: After tweaking up IMs, I was able to get Input_Align to lock long enough to offload the alignments.  Since then we have had several locklosses due to SDF reversions and MC2 saturations.  The IFO has come up quickly and easily after each lockloss.

Incoming operator: Jim

Activity log:

15:45 Chris to X end area for beam tube sealing

16:07 reset ITMx WDs that were tripped upon arrival

17:08 Jeff B to optics lab

17:38 Mitchell to optics lab

17:48 Jeff B out

17:52 Mitchell out

18:05 locked NLN

18:15 lockloss due to SDF reversion

18:30 Joe D to X arm beam tube sealing

19:00 Karen to MY

19:14 Karen done

19:29 lockloss MCS saturation?

20:00 Joe D back

20:06 locked NLN

22:19 lockloss unknown cause

23:15 locked DC readout for Jenne's measurments

23:17 beam tube crew done

23:30 Betsy to optics lab

23:42 Betsy out

23:46 Kyle and John to MY