Day Ops: 16:00-23:59UTC (08:00-16:00PT)
State of H1: unlocked, locking and making past DRMI, but not to Low Noise
Shift Summary:
Work Today:
-
HAM6 - invasive work on cables and moving electronics
-
crane shim work West Bay of the LVEA - sledge hammers were involved
-
ESD driver cable swap - minor incurrsion, no effect on the drivers, drivers were not powered off/on
-
TCS activities outside of the TCS tables
-
Kyle worked on a pump at EX, a stiuation that just came up this morning, he also went to Mid-Y
-
JeffB visited EX and EY
-
Bubba and a vendor went down the Yarm
-
Ed and I filled the PSL chiller with 100ml of water (top chiller, bottom chiller is not complaining that it needs water)
-
EX and EY blend filters changed from Quiet 90s to 45mHz, X direction at EX and Y direction at EY
Issues encoutered today - locking the X arm in IR:
-
I tried and Evan tried, and it did not lock
-
yesterday some X arm locking issues as well, but the arm locked up after Sheila opened some MEDMs, even though she did not change anything
-
higher gain, lower gain, sign change for gain, all were no help today
-
alignment was clearly good, though maybe there's more to consider than the height of the spikes when locking, but routinely the spikes were 0.95 and above
Environmental deturants to locking:
-
useism is at 1.0um/s in the Corner Station
-
high winds between 25 and 35mph for about one hour
-
winds above 15mph for about 2 hours