1320 - 1355 hrs. local -> To and from X-end Moved controller to X2-8 and powered ion pump using gas generator and spare (short) HV cable to demonstrate that issue is with the existing HV cable and not the controller or the pump itself -> cable connector items needed to shorten the existing cable and finish the permanent install of the controller at the X-end station will be here early next week and will, at that time, take steps to locate short. X2-8 BT ion pump will remain out of service until further notice.