thomas.vo@LIGO.ORG - posted 08:41, Tuesday 03 April 2012 (2525)
04/02/2012 Ops Shift
- Preparing for the cartridge install at BSC6, led by Hugh R.
	- Suspensions Locking down
	- TMS being covered by a sock
	- EE guys modifying field connectors
	- Overall meeting to determine readiness
- Cartridge Landed
- PSL Table arriving today from Pacific Cascade Trucking.
- Carbon optical lever giraffe arrived from Aeroshear. 
- Sno Valley came to work on chillers (Ski)
- NorthCoast here for Ken
- DAQ cabling and hardware being rechecked at BSC8 by CDS and reboot of SEI and SUS