Activity Log: All Times in UTC (PT) 16:00 (08:00) Reset IPC error on H1SUSETMY 16:15 (08:15) Adjust ISS Diffracted power from -1.99v 9.4% to -2.0v 8.2% 16:20 (08:20) Goodwill on site for pickup – Bubba escorted 17:00 (09:00) Filiberto & Manny – Pulling cables at End-Y 17:03 (09:03) Christina – Opening OSB rollup door 17:51 (09:51) Corey – Working in the Optics Lab 17:57 (09:57) Chris & Joe – Beam tube sealing on X-Arm - ~800m from End station 18:00 (10:00) Filiberto – Back from End-Y 18:17 (10:17) Kyle – Going to End-X will be in compressor room 18:18 (10:18) Platt Electrical on site – Delivery for Richard 18:18 (10:18) Kiwamu – Transition LVEA to Laser Hazard 19:11 (11:11) Aidan & Nutsinee – Going into LVEA to IO table near HAM4 19:48 (11:48) Joe & Chris – Back from X-Arm 20:00 (12:00) Dale – Big tour in the control room 20:05 (12:05) Aidan & Nutsinee – Out of the LVEA 20:09 (12:09) Corey – Out of the Optics lab 20:10 (12:10) Dale – Another big tour in the control room 20:11 (12:11) Kyle – Back from X-Arm 20:11 (12:11) After initial alignment – Locked at DC_READOUT 20:15 (12:15) Start ASC-CHARD transfer functions for Jenne 20:21 (12:21) Lockloss – Unknown 20:37 (12:37) Kyle – Going to End-Y compressor room 21:11 (13:11) Locked at DC_READOUT for commissioning work 21:12 (13:12) GRB – Ignored alert due to status of IFO 21:20 (13:20) Joe & Chris – Bean tube sealing on X-Arm 21:30 (13:30) CW Injection running & CW Injection inactive messages 21:57 (13:57) Kyle – Back from End-Y 21:59 (13:59) Aidan – Going into LVEA 22:15 (14:15) Turn over to Travis End of Shift Summary: Title: 02/01/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT) Support: Jenne, Incoming Operator: Travis Shift Detail Summary: After running an initial alignment relocked the IFO at DC_RREADOUT for commissioning work. Started TFs for Jenne. Lockloss after about 10 minutes not related to Jenne’s TFs. Relocked at DC_READOUT. Jenne is running her TFs. Hand off to Travis.