Reports until 17:39, Tuesday 02 February 2016
LHO General
patrick.thomas@LIGO.ORG - posted 17:39, Tuesday 02 February 2016 (25327)
Ops Day Shift Summary
ACTIVITY LOG:

15:15 UTC Chris S. headed down X arm for beam tube enclosure sealing 3 doors from end X
15:24 UTC Peter transitioning LVEA to laser safe
15:34 UTC Peter done transitioning LVEA to laser safe
15:35 UTC Peter to H1 PSL to start HPO characterization
16:10 UTC Dale opening OSB receiving rollup door
16:11 UTC Hugh restarting guardian on HAM6 ISI
16:18 UTC Joe D. to LVEA to check batteries, eye wash stations, etc.
16:21 UTC Hugh done guardian update on HAM4 and HAM5, moving to HAM3
16:27 UTC Jeff B. to LVEA to get data from desiccant cabinets and work in the area between the changing room and LVEA
16:30 UTC Filiberto and Richard to LVEA to pull TCS EtherCAT cables from beer garden to mezzanine
16:32 UTC Betsy starting charge measurements
16:46 UTC Jason to H1 PSL to work with Peter
17:01 UTC Received SNEWS alarm as GRB in Verbal Alarms. No indication in GraceDB that it was a test. Arrived at time scheduled for test.
17:03 UTC Cheryl misaligning MC1 to check for light on photodiodes
17:04 UTC Jeff B. done
17:08 UTC Bubba to LVEA to work on crane shimming
17:15 UTC Joe D. done for now
17:17 UTC Hugh tripping HAM5 ISI for guardian update test
17:30 UTC LN2 delivery to mid Y
17:40 UTC Betsy done charge measurements
17:47 UTC Richard removing safety terminals from MSR Beckhoff chassis
17:53 UTC Filiberto done pulling TCS EtherCAT cables by beer garden, moving over to HAM6, Richard helping
18:05 UTC Hugh tripping ITMX for guardian update test
18:14 UTC Hugh done guardian update testing
18:14 UTC Karen and Christina to end stations to clean
18:22 UTC Kyle going to Y2-8.
18:25 UTC Hugh and Jeff B. to mid X, end X, end Y. 3IF0 inventory at mid X. HEPI maintenance at end X and end Y.
18:28 UTC Richard and Filiberto done in LVEA. Filiberto starting modification of Beckhoff Corner Chassis 4.
18:32 UTC Paradise water delivery
18:33 UTC Filiberto powering down Corner Chassis 4, removing chassis, adding terminals
18:47 UTC Corner Chassis 4 down
18:51 UTC Joe D. back to LVEA
18:57 UTC LN2 delivery to gate, Kyle directing driver to CP6
19:11 UTC Evan to CER
19:14 UTC I untripped MC2, noted that nothing was going to the DAC, was in safe mode, Cheryl put it to aligned
19:14 UTC Cheryl moving IMs
19:23 UTC Evan measuring voltage out of ITMY PUM coil driver
SUSAUX123 model restarted
19:29 UTC ASC model restarted
19:31 UTC Hugh back from end/mid stations, going to mechanical room
19:31 UTC Kyle to end X to pickup part
19:34 UTC SUS ITMX RMS UL WD tripped from Evan disconnecting coil driver
19:42 UTC Jim W. recompiling end X BSC ISI model (WP 5717)
19:49 UTC Jim W. taking ETMX to damped
19:51 UTC Coca Cola delivery through gate
19:54 UTC Kyle back to CS for lunch
19:58 UTC SUSAUX ETMX/Y models restarted
20:05 UTC Richard to roof to look at GPS antennas
20:12 UTC Richard back from roof
20:23 UTC TJ reloading ISC lock guardian
20:31 UTC DAQ restart
20:54 UTC Richard removing safety terminals from MSR Beckhoff chassis
20:58 UTC Bubba to LVEA to move cleanroom, continue working on crane shimming
21:01 UTC Richard done removing safety terminals
21:02 UTC ETMX working, Jim W. taking measurements
21:09 UTC Jason and Peter breaking for lunch
21:17 UTC Dave restarting ISS model
21:20 UTC Jim W. taking down all BSC ISIs except ETMX, preparing for model restart (ETMX already done)
21:35 UTC Dave restarting all BSC ISI models except ETMX
21:45 UTC DAQ restart
21:53 UTC Filiberto replacing Corner Chassis 4
21:56 UTC LSC filter module changes applied
22:05 UTC Filiberto done. Richard and Filiberto to end Y to look at chassis
22:12 UTC Jason to H1 PSL. Peter already there.
22:23 UTC Jenne taking graduate students from Australia to measure electronics by HAM6
22:34 UTC Kyle to LVEA
TJ leading tour in CR
22:46 UTC Jenne done
23:19 UTC Filiberto to LVEA to run RF cabling for ASC triplexor
23:26 UTC Dave and Jim B. running timing cable for conlog-test-master
23:30 UTC Kyle to CP3 overfill
23:31 UTC Bubba and John done crane shimming
23:55 UTC Evan redoing measurement from this morning