Displaying report 1-1 of 1.
Reports until 16:04, Wednesday 03 February 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:04, Wednesday 03 February 2016 (25367)
Ops Day Shift Summary
Activity Log: All Times in UTC (PT)

15:43 (07:43) Reset tripped ISI WD on HAM6
15:53 (07:53) Peter – Going into the H2 enclosure to look for electronics equipment
16:00 (08:00) Peter – Added 350ml water to the Diode chiller
16:16 (08:16) Peter – Out of the H2 enclosure
16:45 (08:45) Richard & Filiberto – At HAM6 for Triplexer installation
16:53 (08:53) Joe – Going to X-Arm for beam tube sealing
17:15 (09:15) Carpet installers on site to finish OSB installation
17:35 (09:35) Completed initial alignment
17:36 (09:36) IFO in DOWN for Kiwamu, who is working on the ISS Second Loop 
18:05 (10:05) Richard & Filiberto – Out of the LVEA
18:50 (10:50) Christina & Karen – Forklifting boxes from LSB to VPW and High Bay
18:53 (10:53) Bubba – in LVEA near HAM4/5 working on snorkel lift
18:53 (10:53) Chris – Bean tube sealing on the X-Arm
19:30 (11:30) Bubba – Out of the LVEA
19:56 (11:56) Joe & Chris – Back from X-Arm
20:24 (12:24) Completed operator assigned FAMIS ticket tasks
21:15 (13:15) Joe – Beam tube sealing on X-Arm
21:27 (13:27) Kyle – Going to Y-End compressor room
21:50 (13:50) Jenne & Cao – Going to check the Triplexer installed at HAM6
22:16 (14:16) Aidan & Nutsinee – Going to X-Arm HWS table
22:57 (14:57) Jenne & Cao – Out of the LVEA
23:15 (15:15) Joe – Back from X-Arm
23:45 (15:45) Kyle – Back from End-Y
00:00 (16:00) Turn over to Travis


End of Shift Summary:

Title:  02/03/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT)

Support: Jenne, Kiwamu,   
 
Incoming Operator: Travis

Shift Detail Summary:  Ongoing commissioning work during the 
Displaying report 1-1 of 1.