Activity Log: All Times in UTC (PT) 15:43 (07:43) Reset tripped ISI WD on HAM6 15:53 (07:53) Peter – Going into the H2 enclosure to look for electronics equipment 16:00 (08:00) Peter – Added 350ml water to the Diode chiller 16:16 (08:16) Peter – Out of the H2 enclosure 16:45 (08:45) Richard & Filiberto – At HAM6 for Triplexer installation 16:53 (08:53) Joe – Going to X-Arm for beam tube sealing 17:15 (09:15) Carpet installers on site to finish OSB installation 17:35 (09:35) Completed initial alignment 17:36 (09:36) IFO in DOWN for Kiwamu, who is working on the ISS Second Loop 18:05 (10:05) Richard & Filiberto – Out of the LVEA 18:50 (10:50) Christina & Karen – Forklifting boxes from LSB to VPW and High Bay 18:53 (10:53) Bubba – in LVEA near HAM4/5 working on snorkel lift 18:53 (10:53) Chris – Bean tube sealing on the X-Arm 19:30 (11:30) Bubba – Out of the LVEA 19:56 (11:56) Joe & Chris – Back from X-Arm 20:24 (12:24) Completed operator assigned FAMIS ticket tasks 21:15 (13:15) Joe – Beam tube sealing on X-Arm 21:27 (13:27) Kyle – Going to Y-End compressor room 21:50 (13:50) Jenne & Cao – Going to check the Triplexer installed at HAM6 22:16 (14:16) Aidan & Nutsinee – Going to X-Arm HWS table 22:57 (14:57) Jenne & Cao – Out of the LVEA 23:15 (15:15) Joe – Back from X-Arm 23:45 (15:45) Kyle – Back from End-Y 00:00 (16:00) Turn over to Travis End of Shift Summary: Title: 02/03/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT) Support: Jenne, Kiwamu, Incoming Operator: Travis Shift Detail Summary: Ongoing commissioning work during the