Reports until 08:06, Friday 05 February 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:06, Friday 05 February 2016 (25405)
Ops Day Shift
      Transition Summary:
02/05/2016, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT)
	
State of H1: IFO is unlocked. The wind is a light breeze (< 7mph). Seismic and microseism are still elevated, as they were last night, which may make locking a bit difficult.