(All Times in UTC)
H1 locked for 12+hrs when I walked in & in Observe for Intention Bit & "Logging" for Observatory Mode
-
15:20 Beam Sealing work begins; 100yards from EX (Chris S)
-
15:59 EX & then EY compressor room (Ken)
-
16:06 -16:30 Jim switched SEI ISI Blends (Jim)
-
BS Upconversion investigation (Robert)
-
16:32 Lockloss due earthquake (6.3 Papua New Guinea) ITM/ETMx & BS were taken to DAMPING until 0.03-0.1Hz noise approached 0.1um/s.
-
18:00-18:18 Phase measurement from oscilator ->DARM (Evan)
-
18:20-19:30 ISCT6 Camera work (Elli & crew)---be mindful if image looks different (i.e. position/exposure)---Actually Elli/Nutsinee going to fix this.
-
18:22-19:45 Getting stuff from EY to take to EX. (Kyle)
-
18:25-19:25Attenuators installed at ISCT6 rack (Jenne/Sheila)
-
18:45-20:15 MY to move a ground wire up (Ken)
-
18:50 Burying a seismometer at EY (Robert)
-
19:11-19:30 BS ISI Transfer functions (Jim)
-
19:12 Retrieving Nitrogen bottle in LVEA (Betsy)
-
19:19 Control Solutions on-site (Bubba)
-
21:40 90MHz work at HAM6 (Keita, Jenne)
Made a few attempts at taking H1 to NLN, but dropped out due to an earthquake. Sheila also checked on PRMI transitions.