H1 Status this morning
At around 7:20 beam-sealing work started on the site. Ken went out to the end stations just after 8am. Jim took H1 out of OBSERVE to switch Blends & Robert is queued up for BS upconversion work if H1 remains locked.
Looks like Verbal Alarms was alarming a GRB since 23:50UTC.
AS AIR camera still appears to be frozen.
video4 looks like it was re-booted