Title: 2/12 OWL Shift: 16:00-00:00UTC (08:00-16:00PDT), all times posted in UTC
State of H1: Commissioning
Shift Summary: Started out the day with Richard and Fil trying to solve a noise problem in SR3. A few other various measurements took place during that time. Then Jenne, Sheila, and I struggled with getting the ASC to engange properly during DRMI.
Incoming Operator: Nutsinee
Activity Log: