filiberto.clara@LIGO.ORG - posted 14:18, Thursday 18 February 2016 (25621)
New RF Cable pulled for CPS Timing Sync
Heliax cable for the 71MHz CPS Sync was pulled in this morning. Cable goes from the CER to SUS rack H1:SUS-R3 (next to HAM4). Waiting on N bulkhead connectors for the 2U N patch panel.