15:20 UTC Chris S. starting beam tube tunnel sealing (first 150 yards of X arm) 16:19 UTC Elli, Cao to Y arm TCS table to check beam 16:39 UTC Elli and Cao back 17:21 UTC Ed and I done transitioning LVEA to laser safe, Bubba and John starting crane shimming 17:45 UTC Richard to H1 PSL enclosure to check door lock 17:50 UTC Kiwamu, Elli and Cao to LVEA to turn on Y arm CO2 laser 17:51 UTC Richard back 17:57 UTC Kiwamu, Elli and Cao back 18:07 UTC Karen and Christina opening OSB receiving door to bring in 51 lb package 19:01 UTC John and Bubba done for the day 19:26 UTC Dave rebooting hardware injection machine (WP 5740) 19:53 UTC Dave done 21:20 UTC ASCIMC model restarted 21:22 UTC LSC model restarted 21:24 UTC DAQ restart 21:32 UTC Kiwamu transitioning to laser hazard 21:39 UTC Kiwamu done transitioning to laser hazard, Elli and Cao to ISCT6 22:03 UTC Vinny and Brynley to end Y, opening middle rollup door to move temporary magnetometer - beam tube tunnel sealing (Chris S.) - crane work (John, Bubba) - TCS work (Elli, Cao) - ASCIMC and LSC model changes (Sheila) - PEM work (Vinny and Brynley) - tconvert fix (Dave)