TITLE: 2/24 eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
QUICK SUMMARY: Commissioning work for the entire shift. Letting the WFS settle at DRMI and Locking_Arms green, seemed to help things lock.