Displaying report 1-1 of 1.
Reports until 00:00, Thursday 25 February 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 00:00, Thursday 25 February 2016 (25705)
OPS Eve Shift Summary

TITLE: 2/25 eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
QUICK SUMMARY: More commissiong work. The only to mention was that Verbal reported that Transient Injections running at 4:00UTC and then stopped at 4:43. I'm not sure if there was any injections scheduled that didn't get logged or what it might be.
 

Displaying report 1-1 of 1.