TITLE: 2/26 DAY Shift: 16:00-00:00UTC (08:00-04:00PDT), all times posted in UTC
STATE of H1:
Overall Summary:
On the plate today was HWS work (this was most of the shift) & OMC noise/noise hunting in the PM. In parallel to the HWS work, we had the ETMX Sattelite box mods performed, and also did charge measurements on ETMy & ETMx. I also started some investigations for why arm powers drop during DRMI ON POP (this was something Sheila requested)....handed this over to TJ.
Shift Activities:
-
15:30 Beam sealing work (Chris S)
-
16:12-17:08 SR2 SUS (on HAM4) Sattelite Box work (Filiberto, Ed)
-
16:50 - 23:27 Hartman work begining (Elli, Cao, Kiwamu, Nutsinee)
-
17:25-18:41 ETMx SUS Sattelite Box work (Filberto, Ed)
-
17:50 - 18:30 Moving outside ground seismometer (Hugh, Jim)
-
17:55 - 19:00 ETMy charge measurement!!! (Corey)
-
18:21 -19:15 Chandra tour
-
18:55 ETMx charge measurement (Corey)
-
19:00-19:40 (~1hr) EY Magnetometer work (Brynley, Vinny)
-
19:22 ETMx charge measurement attempt #2 (Corey)
-
19:27 Driving to each bldg (Kyle)
-
21:15 ETMy sattelite box work (Fil, Ed)
-
22:16 ETMx ISI shaking (Sheila, Jim)
-
23:00 CP3 refill (Kyle)
-
23:05 Untripping hardware watchdog at EY (Fil)
-
23:36 Adjusting levelt on STS2 seismometer near HAM2 (Hugh)
-
23:40 Fire Dept on site, due to a trouble alarm which alarmed briefly and cleared on its own (so they didn't really do anything when they came)