Reports until 15:06, Tuesday 10 April 2012
H2 INS
jodi.fauver@LIGO.ORG - posted 15:06, Tuesday 10 April 2012 (2578)
BSC8 Entry for re-insertion
-Cleaning (Completed 10 April 2012) Terry and crew 
*Note-ML waived second cleaning. Terry S. et al reported that the chamber was very clean when they did first cleaning.
-Door removal (Completed 10 April 2012) Apollo
-Retrieve witness plates(Completed 10 April 2012) Travis and Jodi
*Note-These five plates were put in place just before BSC8 was closed up and pumped down. 
Locations: 
#1-GV1 nozzle=Witness plate 5 (6 particles on whole plate)
#2-GV3 bellows convolution=Witness plate 4 (11 particles on whole plate)
#3-YBM bellows convolution=Witness plate 3 (8 particles on whole plate)
#4-Face of quad optic/ACB face=Witness plate 2 (5 particles on whole plate)
#5-Center of BSC floor=Witness plate 1 (8 particles on whole plate)
They should give us some idea of the quantity and quality of particulate that gets moved around during one pump down/venting cycle. 
-ACB swing back (10 April 2012)Thomas and Travis  
-Install BSC repair arm, 5-axis table, and elevator(Completed 10 April 2012) Apollo, CIT-Buckland and Anderson 
-Quad implementation ring and hardware in staging room (10 April 2012) Jodi