Displaying report 1-1 of 1.
Reports until 01:35, Tuesday 01 March 2016
LHO General
patrick.thomas@LIGO.ORG - posted 01:35, Tuesday 01 March 2016 (25797)
Ops Evening Summary
02:18 UTC Sheila and Jenne at end X checking green beam alignment
02:53 UTC Nutsinee to LVEA to find equipment for Elli
03:22 UTC Nutsinee back
03:40 UTC Sheila and Jenne back
04:15 UTC X arm locked on green
05:29 UTC Initial alignment done
09:31 UTC ISC_LOCK set to down. Started script for ring heater test.

Cheryl, Jenne and Sheila were struggling to get the X arm realigned on green after HEPI and ISI trips earlier in the day. After this was resolved we ran through an initial alignment. We have since been having trouble with engaging the ASC loops. We have left the ISC_LOCK guardian at down and started the script for the ring heater test.
Displaying report 1-1 of 1.