Reports until 16:17, Wednesday 02 March 2016
H1 General
cheryl.vorvick@LIGO.ORG - posted 16:17, Wednesday 02 March 2016 - last comment - 08:20, Thursday 03 March 2016(25843)
Ops Day Summary:

Day Shift 16:00-23:59UTC (08:00-16:00PT)

State of H1: DRMI lock for Jenne

Shift Summary:

Site Activities:

- 19:30 Kyle - LVEA to survey for upgrade

- 19:45 Kyle - out of LVEA

- 21:27 Corey - optics lab

- 21:15 Ed - LVEA to reset PSL watchdog

- 21:25 Ed - out of PSL

 

Locking / Initial Alignment:

- locking X arm in red was very fast, and had good power

- ITMY needed more of an offset during SRC alignment

- PRMI needed to adjust BS for DRMI

- DRMI is well aligned and relocking quickly for the last 2-3 hours of the shift

 

Control Room:

- Video0 froze, now fixed after a reboot

- Video4 had the wrong striptool displayed, now fixed

Comments related to this report
cheryl.vorvick@LIGO.ORG - 16:40, Wednesday 02 March 2016 (25844)

ITMY mis-alignment issue tracked down to offset, now fixed.

ITMY drivealign_P2L_gain change from 1.05 to 0.6 accepted after the OK by Sheila, had been 0.6 for at least 10 days.

Images attached to this comment
edmond.merilh@LIGO.ORG - 08:20, Thursday 03 March 2016 (25854)

The Front End watchdog reset takes place in the LASER Diode Room, not in the LVEA/PSL enclosure. :)