Day Shift 16:00-23:59UTC (08:00-16:00PT)
State of H1: DRMI lock for Jenne
Shift Summary:
Site Activities:
- 19:30 Kyle - LVEA to survey for upgrade
- 19:45 Kyle - out of LVEA
- 21:27 Corey - optics lab
- 21:15 Ed - LVEA to reset PSL watchdog
- 21:25 Ed - out of PSL
Locking / Initial Alignment:
- locking X arm in red was very fast, and had good power
- ITMY needed more of an offset during SRC alignment
- PRMI needed to adjust BS for DRMI
- DRMI is well aligned and relocking quickly for the last 2-3 hours of the shift
Control Room:
- Video0 froze, now fixed after a reboot
- Video4 had the wrong striptool displayed, now fixed
ITMY mis-alignment issue tracked down to offset, now fixed.
ITMY drivealign_P2L_gain change from 1.05 to 0.6 accepted after the OK by Sheila, had been 0.6 for at least 10 days.
The Front End watchdog reset takes place in the LASER Diode Room, not in the LVEA/PSL enclosure. :)