State of H1: locking and getting Engage ASC, Sheila working on the ASC
Site Activities:
-
Maintenance included a reboot of all CR computers, including those on the walls
-
All but nuc4 have been restored
-
New code for EX VAC and CP8 PID loop - Kyle and Patrick still here evaluating
-
Video0 has special vacuum screens so that the new code at EX can be monitored - blue sticky note on Video1
-
nuc0 has the user "***-test" logged in - controls by itself didn't work
-
DAC restart to change channels
-
Kyle and Patrick were at EX to verify the new control software - back now
LVEA and OSB optics lab access:
-
Nutsinee, Ed, Filiberto, Dick, Rick, Kyle, Gerardo, Robert, Richard
Currently:
-
Sheila has H1 locked in Engage ASC, and is working on the ASC