Activity Log: All Times in UTC (PT) 16:00 (08:00) Ellie – Taking SRC interface measurements 16:58 (08:58) Ellie – Going into Optics Lab 17:10 (09:10) Ed – Add water to PSL Diode chiller 17:25 (09:25) Hugh – Going into the CER 17:32 (09:32) Hugh – Out of CER 17:36 (09:36) Ellie – Out of Optics Lab 20:01 (12:01) Kyle – Going into LVEA to turn off vacuum pump 20:05 (12:05) Dick – Going into the LVEA checking for noise at ICS rack 20:40 (12:40) Kyle – Out of the LVEA 20:48 (12:48) Ellie – Transition LVEA to Laser Hazard 20:50 (12:50) Ellie & Cao – Going into the LVEA to work on ISCT6 table 21:59 (13:59) Ellie & Cao – Out of the LVEA 22:13 (14:13) Gerardo – Going to X-Beam manifold to make some measurements 22:40 (14:40) Gerardo – Out of the LVEA 23:00 (15:00) Gerardo – Going to Mid-Y for CP-3 fill 23:30 (15:30) Gerardo – Back from Mid-Y 23:50 (15:50) Ellie – Going into the LVEA tow work on ISCT6 End of Shift Summary: Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT) Support: Incoming Operator: Cheryl Shift Detail Summary: Commissioning work all day.