TITLE: 03/10 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: Nutsinee SHIFT SUMMARY:'Mainly stayed locked on DRMI all day LOG: 15:58 Jeff B out to LVEA for parts. 16:23 Jeff out o LVEA 16:26 Christina moving pallets around:into highbay and over to warehouse. 16:52 Christina/Karen finished moving pallets 16:58 Kyle out to EX 17:02 Notification: "ISI_RINGUP: ETMY ISI ringing up" 17:30 Jeff out to LVEA to terminate dust monitor plumbing. 17:40 PEM ISC Timing slave power supply swap starts -Fil 17:45 Robert out to EY 17:48 Fil out of LVEA; Jim rebooting PEM ISC 18:00 Begin initial alignment. Jim working on stability blends due to increasin winds; Sheila restoring a bad safe.snap inhibiting IMC 18:35 Kyle back from EX 21:25 Jeff B to End Station Compressor rooms 22:15 Jeff back from Ends