H1 General (OpsInfo)
edmond.merilh@LIGO.ORG - posted 16:01, Thursday 10 March 2016 (25992)
Shift Summary - Day
TITLE: 03/10 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:'Mainly stayed locked on DRMI all day
LOG:
15:58 Jeff B out to LVEA for parts.
16:23 Jeff out o LVEA
16:26 Christina moving pallets around:into highbay and over to warehouse.
16:52 Christina/Karen finished moving pallets
16:58 Kyle out to EX
17:02 Notification: "ISI_RINGUP: ETMY ISI ringing up"
17:30 Jeff out to LVEA to terminate dust monitor plumbing.
17:40 PEM ISC Timing slave power supply swap starts -Fil
17:45 Robert out to EY
17:48 Fil out of LVEA; Jim rebooting PEM ISC
18:00 Begin initial alignment. Jim working on stability blends due to increasin winds; Sheila restoring a bad safe.snap inhibiting IMC
18:35 Kyle back from EX
 21:25 Jeff B to End Station Compressor rooms
22:15 Jeff back from Ends