Reports until 07:18, Thursday 12 April 2012
H1 FMP
jodi.fauver@LIGO.ORG - posted 07:18, Thursday 12 April 2012 (2600)
HAM1 ICC
Mechanical brushing was completed using a total of three drills (1 non-starter, 1 short-timer, and 1 marathon-man). Hand detailing with the stainless steel toothbrushes was completed around the fins and under the support tubes.First vacuum was completed including the removal of bellows protection. Isopropanol was decanted in preparation for wipe-down.