Reports until 00:05, Friday 11 March 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:05, Friday 11 March 2016 (26003)
Ops Eve Shift Summary

TITLE: 03/10 day Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ed
QUICK SUMMARY: ASC work still on going.