Reports until 08:06, Friday 11 March 2016
H1 General (OpsInfo)
edmond.merilh@LIGO.ORG - posted 08:06, Friday 11 March 2016 (26007)
Shift Transition - Day
TITLE: 03/11 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind Avg: 7 mph
    Primary useism: 0.03 μm/s
    Secondary useism: 0.31 μm/s 
QUICK SUMMARY:IFO locked on ENGAGE_ASC_PART3 since 09:04:05UTC.