BSC6 ETMY CPS Issues mostly sorted out
We started the day with the need to swap out a Probe to match up the electronics board.  We had some intermittent grounding issues and finally got a good ground and things looked better.  I need Vincent to bless the spectra now but I think we are in good shape. We do need to possibly more formalize how the CPS satellite racks/boards are tied to the ground to prevent this problem in the future.

JimW RichA Hugh